Lots in October

In October we…

  • Poured a 36’x36′ concrete slab.
  • Got grid power hooked up.
  • Had our pump installed in the well.
  • Dug most of the septic system.
  • Had the septic tank delivered along with all the pipe, pump, etc for it.
  • Built most of the building on the slab.
  • Got internet (only .3 meg, yes, that’s 6 times dial-up speed).